Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
charting done in train | 1.98 | 1 | 5553 | 69 | 22 |
charting | 1.87 | 0.7 | 6770 | 94 | 8 |
done | 1.33 | 0.5 | 9839 | 9 | 4 |
in | 0.14 | 0.5 | 5682 | 95 | 2 |
train | 1.18 | 0.8 | 3404 | 58 | 5 |
Keyword | CPC | PCC | Volume | Score |
---|---|---|---|---|
charting done in train | 0.63 | 0.9 | 5155 | 68 |
when is charting done for trains | 1.82 | 0.5 | 3120 | 20 |
charting station of train | 1.24 | 0.5 | 3240 | 71 |
charting time of train | 0.27 | 0.9 | 1549 | 84 |
when train chart is prepared for train | 0.75 | 0.4 | 6061 | 55 |
when the chart prepared in train | 1.99 | 0.7 | 1896 | 67 |
chart preparation of train | 1.17 | 0.8 | 3948 | 79 |
take the a train chart | 0.35 | 0.3 | 433 | 81 |
how to see chart of train | 1.73 | 0.6 | 2342 | 24 |
how to check chart of train | 0.47 | 0.4 | 9386 | 28 |
train chart preparation tips | 1.93 | 0.7 | 6575 | 21 |