Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
roadtechs nuclear outage list | 1.43 | 0.5 | 1511 | 85 | 29 |
roadtechs | 1.94 | 0.6 | 8205 | 12 | 9 |
nuclear | 0.95 | 0.4 | 3942 | 72 | 7 |
outage | 1.18 | 0.3 | 2560 | 53 | 6 |
list | 1.46 | 0.4 | 6030 | 60 | 4 |
Keyword | CPC | PCC | Volume | Score |
---|---|---|---|---|
roadtechs nuclear outage list | 1.97 | 0.8 | 9309 | 77 |
roadtechs nuclear outage list 2023 | 1.53 | 0.7 | 1586 | 49 |
roadtechs nuclear outages | 0.63 | 0.8 | 5526 | 56 |
roadtechs nuclear outages 2024 | 0.16 | 0.1 | 9170 | 7 |
roadtechs nuclear outages 2023 | 0.11 | 0.5 | 9350 | 4 |
road tech nuclear outages 2024 | 0.62 | 0.9 | 7732 | 78 |
roadtechs outage list 2023 | 0.85 | 0.5 | 2446 | 21 |
nuclear outage list 2024 | 0.81 | 0.8 | 751 | 21 |
nuclear reactor reaches 100 power outage | 1.82 | 0.6 | 5395 | 58 |
nuclear plant outage schedule | 1.93 | 0.7 | 3788 | 74 |
nnec power outage map | 1.47 | 0.4 | 6251 | 35 |
nuke plant outage schedule | 0.67 | 0.1 | 5781 | 30 |
nec power outage map | 1.92 | 0.7 | 9518 | 78 |
ctec power outage map | 0.24 | 1 | 6698 | 26 |
naec power outage map | 1.89 | 0.1 | 5475 | 90 |
t and tec planned outages | 1.41 | 0.8 | 5953 | 82 |