Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
datum meaning in construction | 1.32 | 0.6 | 2399 | 17 | 29 |
datum | 0.96 | 1 | 4429 | 83 | 5 |
meaning | 0.05 | 1 | 550 | 73 | 7 |
in | 0.04 | 0.8 | 249 | 57 | 2 |
construction | 0.29 | 0.1 | 4394 | 65 | 12 |
Keyword | CPC | PCC | Volume | Score |
---|---|---|---|---|
datum meaning in construction | 0.41 | 0.2 | 9840 | 13 |
datum meaning in architecture | 0.7 | 0.7 | 8856 | 71 |
what is a datum in engineering | 1.61 | 1 | 9405 | 58 |
define datum in design | 0.93 | 0.8 | 9909 | 60 |
define datum in engineering | 0.88 | 0.2 | 3658 | 100 |
what is a datum point in construction | 0.11 | 0.3 | 6765 | 26 |
what is a datum in architecture | 0.48 | 0.8 | 2051 | 100 |
what is datum level in building construction | 1.26 | 0.9 | 625 | 79 |
datum meaning in surveying | 1.58 | 0.3 | 7043 | 87 |
what is datum in civil engineering | 1.58 | 0.2 | 7198 | 58 |
what is datum in engineering drawing | 1.3 | 0.8 | 2449 | 15 |
what is datum in surveying | 1.51 | 0.4 | 7558 | 73 |
what is a datum | 1.44 | 0.4 | 3783 | 5 |
what is a datum in drafting | 1.96 | 1 | 4781 | 59 |
what is the meaning of datum | 0.18 | 0.6 | 7561 | 41 |
what is meant by datum | 1.25 | 1 | 8225 | 14 |
definition of a datum | 0.31 | 0.1 | 527 | 92 |
what does a datum establish | 0.48 | 0.8 | 5305 | 62 |
how to define datums | 0.92 | 0.3 | 4038 | 24 |