Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
dbacks schedule in september | 0.34 | 0.2 | 3193 | 28 | 28 |
dbacks | 0.86 | 0.1 | 5943 | 2 | 6 |
schedule | 1.78 | 1 | 5644 | 66 | 8 |
in | 1.22 | 1 | 8332 | 54 | 2 |
september | 0.53 | 0.8 | 8340 | 78 | 9 |
Keyword | CPC | PCC | Volume | Score |
---|---|---|---|---|
dbacks schedule in september | 1.61 | 0.2 | 6633 | 7 |