Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
define datum in construction | 0.83 | 0.4 | 497 | 36 | 28 |
define | 0.03 | 0.4 | 8302 | 60 | 6 |
datum | 1.36 | 0.6 | 671 | 64 | 5 |
in | 1.57 | 0.8 | 4063 | 97 | 2 |
construction | 1.86 | 0.9 | 4235 | 3 | 12 |
Keyword | CPC | PCC | Volume | Score |
---|---|---|---|---|
define datum in construction | 0.93 | 0.2 | 9534 | 15 |
define datum in design | 0.44 | 0.4 | 6372 | 85 |
define datum in engineering | 0.14 | 0.7 | 2819 | 29 |
what is a datum point in construction | 1.18 | 0.2 | 4720 | 90 |
what is a datum in engineering | 1.25 | 0.4 | 3753 | 17 |
what is datum level in building construction | 0.64 | 0.5 | 8007 | 22 |
what is a datum in architecture | 0.77 | 0.6 | 340 | 11 |
datum meaning in architecture | 0.24 | 0.3 | 6508 | 38 |
datum levels in construction | 0.99 | 0.3 | 9703 | 78 |
define datum in surveying | 0.87 | 0.1 | 6225 | 14 |
what is datum in civil engineering | 0.56 | 0.8 | 2304 | 15 |
what is datum in engineering drawing | 0.61 | 0.9 | 7117 | 35 |
what is datum in surveying | 1.42 | 0.1 | 9361 | 46 |
what is a datum in drafting | 0.6 | 0.3 | 1293 | 5 |
datum meaning in surveying | 0.09 | 0.6 | 9707 | 92 |
what is a datum | 0.69 | 0.2 | 5478 | 24 |
what does a datum establish | 0.44 | 0.8 | 7235 | 95 |
definition of a datum | 0.93 | 1 | 8053 | 21 |
how to define datums | 1.7 | 0.9 | 6202 | 37 |
what is meant by datum | 1.73 | 0.5 | 8682 | 3 |