Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
oracle primavera submittal exchange | 0.98 | 0.8 | 5592 | 37 | 35 |
oracle | 1.17 | 0.2 | 4904 | 93 | 6 |
primavera | 1.82 | 0.4 | 3736 | 99 | 9 |
submittal | 0.35 | 0.5 | 1838 | 36 | 9 |
exchange | 1.71 | 0.7 | 9342 | 61 | 8 |
Keyword | CPC | PCC | Volume | Score |
---|---|---|---|---|
oracle primavera submittal exchange | 1.03 | 0.1 | 5289 | 34 |