Keyword | CPC | PCC | Volume | Score | Length of keyword |
---|---|---|---|---|---|
role of developers in scrum | 1.45 | 0.5 | 7914 | 62 | 27 |
role | 1.05 | 0.8 | 5224 | 45 | 4 |
of | 0.97 | 0.1 | 145 | 14 | 2 |
developers | 0.2 | 0.4 | 6695 | 9 | 10 |
in | 1.93 | 1 | 712 | 30 | 2 |
scrum | 1.2 | 0.2 | 6889 | 84 | 5 |
Keyword | CPC | PCC | Volume | Score |
---|---|---|---|---|
role of developers in scrum | 0.16 | 0.9 | 1151 | 63 |